Project

Avaada to boost RE load to meet demand from India’s data centres

The company eyes 30 gigawatts of renewable energy capacity by 2030.

Avaada to boost RE load to meet demand from India’s data centres

The company eyes 30 gigawatts of renewable energy capacity by 2030.

Japanese firms to study floating vertical axis wind turbines

This will be considered a “game-changing next-generation” technology.

Tata Power commences production from 2 GW Tamil Nadu solar cell line

Additional 2 GW will be added in the following weeks.

JSW Energy unit bags 600 MW wind-solar hybrid project in Maharashtra

This boosts the company’s generation capacity to 18.2 GW.

OX2 sells two Australia solar projects to European Energy

Their capacity can provide energy to 54,000 Aussie homes.

Vanda RE to supply 300 MW of solar power to Singapore

This will be sourced from a 2,000 MW solar and energy storage project.

UK’s Actis to invest $600m in PH’s Terra Solar project

The investment firm will take a controlling interest of 40%.